Assessment Year | 2001 |
---|---|
Principal Product | Water & Oil Well Drilling Equipment |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
314,279
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,020 | 3,608,400 |
kWh
|
$0.026 |
Electricity Fees | $142,315 | - |
|
- |
Natural Gas | $108,331 | 22,510 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $90,113 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $88,000 | $17,542 | - | - |
$88,000
-
MMBtu
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,333 | $577 |
$189
7,190
kWh
|
$307
-
kW-mo/yr
|
- | - | $210 | - | $627 | |
03 | 3.3125: Use distillation, evaporation to remove contaminants | $2,772 | $5,200 | - | - | - |
$2,772
-
gal
|
- | - | - | |
04 | 4.821: Pay bills on time to avoid late fees | $463 | - | - | - | - | - | - | $463 | - | |
05 | 2.2135: Repair and eliminate steam leaks | $1,650 | $720 |
$637
14,545
kWh
|
$1,013
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.3212: Optimize plant power factor | $14,115 | $5,150 | - |
$14,115
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $108,333 | $29,189 |
$826
21,735
kWh
|
$15,435
-
kW-mo/yr
|
$88,000
-
MMBtu
|
$2,772
-
gal
|
$210 | $463 | $627 | ||
TOTAL IMPLEMENTED | $90,113 | $18,262 |
$637
14,545
kWh
|
$1,013
-
kW-mo/yr
|
$88,000
-
MMBtu
|
- | - | $463 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs