ITAC Assessment: CO0109
ITAC logo
ITAC Assessment: CO0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product METAL ELECTRICAL ENCLOSURES
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,489 1,317,409
kWh
Natural Gas $55,134 13,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $867 $1,200 - $867
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $573 $540 $573
9,379
kWh
-
03 2.2511: Insulate bare equipment $683 $900 - $683
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $2,672 $45 $605
9,672
kWh
$2,067
-
MMBtu
05 2.8121: Apply for tax-free status for energy purchases $3,517 $250 $1,767
-
kWh
$1,750
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,069 $500 $1,069
-
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $12,647 $2,000 - $12,647
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $796 $390
6,448
kWh
-
TOTAL RECOMMENDED $22,418 $6,231 $4,404
25,499
kWh
$18,014
-
MMBtu
TOTAL IMPLEMENTED $21,551 $5,031 $4,404
25,499
kWh
$17,147
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs