ITAC Assessment: BS0071
ITAC logo
ITAC Assessment: BS0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Combine Leveling Systems
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 22,500
ft2
Annual Production 100
units
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,743 263,920
kWh
Electricity Demand $8,989 1,498
kW-mo/yr
LPG $9,708 556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,181 $2,633 $80
1,268
kWh
$1,101
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $124 $187 $124
1,975
kWh
- -
03 2.7135: Install occupancy sensors $349 $660 $349
5,550
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $765 $2,575 $765
12,151
kWh
- -
05 2.2511: Insulate bare equipment $372 $384 - - $372
-
MMBtu
TOTAL RECOMMENDED $2,791 $6,439 $1,318
20,944
kWh
$1,101
-
kW-mo/yr
$372
-
MMBtu
TOTAL IMPLEMENTED $2,419 $6,055 $1,318
20,944
kWh
$1,101
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs