ITAC Assessment: BS0075
ITAC logo
ITAC Assessment: BS0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Corrugated Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 200,000
ft2
Annual Production 900,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,199 6,276,835
kWh
Electricity Demand $90,078 13,733
kW-mo/yr
Electricity Fees $3,785 -
Natural Gas $254,019 66,786
MMBtu
LPG $46,324 5,122
MMBtu
Waste Disposal Costs
Water Usage $5,103 4,640
Tgal
TOTAL YEARLY COSTS $702,508
RECOMMENDED SAVINGS* $88,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,685 $1,464 $6,685
138,398
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $513 $502 $513
10,619
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $146 $52 $146
3,025
kWh
- - - -
04 2.4224: Upgrade controls on compressors $7,616 $3,250 $6,239
129,163
kWh
$1,377
-
kW-mo/yr
- - -
05 3.4151: Minimize water usage $256 $53 - - $256
-
Tgal
- -
06 3.1191: Change procedures / equipment / operating conditions $73,741 $24,334 - - - $(-145,600.0) $219,341
TOTAL RECOMMENDED $88,957 $29,655 $13,583
281,205
kWh
$1,377
-
kW-mo/yr
$256
-
Tgal
$(-145,600.0) $219,341
TOTAL IMPLEMENTED $88,957 $29,655 $13,583
281,205
kWh
$1,377
-
kW-mo/yr
$256
-
Tgal
$(-145,600.0) $219,341
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs