ITAC Assessment: KU0423
ITAC logo
ITAC Assessment: KU0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Radio Controls
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 17,320
ft2
Annual Production 3,300
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,325 179,660
kWh
Natural Gas $4,562 923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,156 $1,663 $799
8,792
kWh
- $357
02 2.7135: Install occupancy sensors $240 $300 $240
2,638
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $125 $80
879
kWh
- -
04 2.7261: Install timers and/or thermostats $904 $900 - $904
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $229 $477 $293
3,224
kWh
$(-64.0)
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $187 $135 $187
2,052
kWh
- -
TOTAL RECOMMENDED $2,796 $3,600 $1,599
17,585
kWh
$840
-
MMBtu
$357
TOTAL IMPLEMENTED $1,224 $1,325 $320
3,517
kWh
$904
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs