ITAC Assessment: AS0449
ITAC logo
ITAC Assessment: AS0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,433 1,438,276
kWh
Electricity Demand $23,492 4,943
kW-mo/yr
Electricity Fees $1,988 -
Waste Disposal Costs
Water Usage $8,241 2,594
Tgal
TOTAL YEARLY COSTS $167,154
RECOMMENDED SAVINGS* $31,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,280 $31,442 $7,477
90,410
kWh
$1,803
-
kW-mo/yr
02 2.7132: Install timers on light switches in little used areas $1,206 $1,200 $1,206
13,991
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,408 $260 $2,235
26,669
kWh
$173
-
kW-mo/yr
04 2.4224: Upgrade controls on compressors $5,532 $344 $4,640
55,976
kWh
$892
-
kW-mo/yr
05 2.7226: Use computer programs to optimize hvac performance $12,918 $55,000 $10,838
129,327
kWh
$2,080
-
kW-mo/yr
TOTAL RECOMMENDED $31,344 $88,246 $26,396
316,373
kWh
$4,948
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs