Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,698

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0619 #07 Y:2026 Install spectral reflectors / delamp $345 $563
AS0619 #06 Y:2026 Reduce space conditioning during non-working hours $1,638 $94
AS0619 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,570 $4,064
AS0619 #04 Y:2026 Replace existing equipment with more suitable substitutes $10,148 $419
AS0619 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $22,021 $900
AS0619 #02 Y:2026 Use solar heat to make electricty $63,128 $634,056
AS0619 #01 Y:2026 Replace existing equipment with more suitable substitutes $507,698 $1,200,000
AS0618 #10 Y:2026 Insulate glazing, walls, ceilings, and roofs $67 $728
AS0618 #09 Y:2026 Reduce glazed areas in buildings $69 $769
AS0618 #08 Y:2026 Keep equipment clean $466 $1,354
AS0618 #07 Y:2026 Utilize controls to operate equipment only when needed $488 $586
AS0618 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $906 $178
AS0618 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,050 $1,691
AS0618 #04 Y:2026 Add air shields to trucks to increase fuel mileage $8,752 $14,707
AS0618 #03 Y:2026 Burn a less expensive grade of fuel $9,381 $6,914
AS0618 #02 Y:2026 Replace fossil fuel equipment with electrical equipment $12,397 $250,000
AS0618 #01 Y:2026 Increase efficiency of trucks $18,148 $80,584
AS0617 #08 Y:2026 Install heat pipes / raise cooling setpoint $662 $76
AS0617 #07 Y:2026 Install occupancy sensors $960 $1,199
AS0617 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,401 $6,692