Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,658

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0614 #09 Y:2026 Install occupancy sensors $74 $53
AS0614 #08 Y:2026 Install spectral reflectors / delamp $107 $18
AS0614 #07 Y:2026 Replace broken windows and/or window sash $654 $105
AS0614 #06 Y:2026 Insulate bare equipment $755 $3,123
AS0614 #05 Y:2026 Conserve energy by efficient use of vending machines $1,404 $1,245
AS0614 #04 Y:2026 Make a practice of turning off lights when not needed $2,428 $405
AS0614 #03 Y:2026 Eliminate or reduce compressed air usage $2,900 $140
AS0614 #02 Y:2026 Install timers on light switches in little used areas $7,253 $6,917
AS0614 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,757 $13,649
AS0613 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $72 $154
AS0613 #06 Y:2026 Install occupancy sensors $314 $220
AS0613 #05 Y:2026 Insulate bare equipment $1,723 $808
AS0613 #04 Y:2026 Re-arrange equipment layout to reduce labor costs $2,160 $680
AS0613 #03 Y:2026 Use solar heat to make electricty $4,425 $27,975
AS0613 #02 Y:2026 Replace boiler $4,953 $7,100
AS0613 #01 Y:2026 Change rate schedules or other changes in utility service $22,713 $13,550
AS0612 #06 Y:2026 Install occupancy sensors $207 $585
AS0612 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,245 $20,000
AS0612 #04 Y:2026 Install timers on light switches in little used areas $3,058 $1,100
AS0612 #03 Y:2026 Pay utility bills on time $39,461 $10,785