| Assessment Year | 2025 |
|---|---|
| Principal Product | Specialty Fasteners |
| NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $10 M to 50M |
| # of Employees | 102 |
| Plant Area |
65,109
ft2
|
| Annual Production | 74,000,000
units
|
| Production Hrs. Annual | 2,678
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $142,016 | 1,201,684 |
kWh
|
$0.12 |
| Electricity Demand | $62,024 | 5,340 |
kW-mo/yr
|
$11.61 |
| Electricity Fees | $6,633 | - |
|
- |
| TOTAL YEARLY COSTS | $210,673 | |||
| RECOMMENDED SAVINGS* | $192,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $107,581 | $4,250,000 |
$1,358
11,492
kWh
|
$1,223
-
kW-mo/yr
|
$4,000 | $101,000 | |
| 02 | 2.9114: Use solar heat to make electricty | $80,861 | $486,301 |
$73,681
623,360
kWh
|
$7,180
-
kW-mo/yr
|
- | - | |
| 03 | 2.7132: Install timers on light switches in little used areas | $1,657 | $656 |
$1,657
14,016
kWh
|
- | - | - | |
| 04 | 2.6211: Conserve energy by efficient use of vending machines | $1,407 | $489 |
$1,198
10,138
kWh
|
$209
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,174 | $1,423 |
$2,105
17,806
kWh
|
$(-931.0)
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $192,680 | $4,738,869 |
$79,999
676,812
kWh
|
$7,681
-
kW-mo/yr
|
$4,000 | $101,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs