Assessment Year | 2025 |
---|---|
Principal Product | Specialty Fasteners |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
65,109
ft2
|
Annual Production | 74,000,000
units
|
Production Hrs. Annual | 2,678
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,016 | 1,201,684 |
kWh
|
$0.12 |
Electricity Demand | $62,024 | 5,340 |
kW-mo/yr
|
$11.61 |
Electricity Fees | $6,633 | - |
|
- |
TOTAL YEARLY COSTS | $210,673 | |||
RECOMMENDED SAVINGS* | $798,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $606,000 | $10,786,500 | - | - | - | $606,000 | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $107,581 | $4,250,000 |
$1,358
11,492
kWh
|
$1,223
-
kW-mo/yr
|
$4,000 | $101,000 | |
03 | 2.9114: Use solar heat to make electricty | $80,861 | $486,301 |
$73,681
623,360
kWh
|
$7,180
-
kW-mo/yr
|
- | - | |
04 | 2.7132: Install timers on light switches in little used areas | $1,657 | $656 |
$1,657
14,016
kWh
|
- | - | - | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $1,407 | $489 |
$1,198
10,138
kWh
|
$209
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,174 | $1,423 |
$2,105
17,806
kWh
|
$(-931.0)
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $798,680 | $15,525,369 |
$79,999
676,812
kWh
|
$7,681
-
kW-mo/yr
|
$4,000 | $707,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs