ITAC Assessment: AS0608
ITAC logo
ITAC Assessment: AS0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Specialty Fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 65,109
ft2
Annual Production 74,000,000
units
Production Hrs. Annual 2,678
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,016 1,201,684
kWh
Electricity Demand $62,024 5,340
kW-mo/yr
Electricity Fees $6,633 -
TOTAL YEARLY COSTS $210,673
RECOMMENDED SAVINGS* $798,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $606,000 $10,786,500 - - - $606,000
02 4.652: Replace existing equipment with more suitable substitutes $107,581 $4,250,000 $1,358
11,492
kWh
$1,223
-
kW-mo/yr
$4,000 $101,000
03 2.9114: Use solar heat to make electricty $80,861 $486,301 $73,681
623,360
kWh
$7,180
-
kW-mo/yr
- -
04 2.7132: Install timers on light switches in little used areas $1,657 $656 $1,657
14,016
kWh
- - -
05 2.6211: Conserve energy by efficient use of vending machines $1,407 $489 $1,198
10,138
kWh
$209
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,174 $1,423 $2,105
17,806
kWh
$(-931.0)
-
kW-mo/yr
- -
TOTAL RECOMMENDED $798,680 $15,525,369 $79,999
676,812
kWh
$7,681
-
kW-mo/yr
$4,000 $707,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs