Assessment Year | 1994 |
---|---|
Principal Product | Gas Turbine Engines |
NAICS |
n/a
|
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $10 M to 50M |
# of Employees | 123 |
Plant Area |
160,000
ft2
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,577 | 1,804,807 |
kWh
|
$0.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $434 | $300 |
$434
4,103
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $606 | $200 |
$606
5,862
kWh
|
|
03 | 2.2511: Insulate bare equipment | $1,549 | $588 |
$1,549
14,947
kWh
|
|
04 | 2.7234: Use heat pump for space conditioning | $17,728 | $34,200 |
$17,728
172,333
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $1,100 | $2,367 |
$1,100
10,844
kWh
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,597 | $22,202 |
$12,597
122,509
kWh
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,955 | $16,200 |
$10,955
106,389
kWh
|
|
08 | 2.7135: Install occupancy sensors | $2,525 | $3,075 |
$2,525
24,619
kWh
|
|
09 | 2.7134: Use photocell controls | $545 | $60 |
$545
5,275
kWh
|
|
TOTAL RECOMMENDED | $48,039 | $79,192 |
$48,039
466,881
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs