| Assessment Year | 1990 |
|---|---|
| Principal Product | PRESSURE PIPE COMPONENTS |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 67 |
| Plant Area |
n/a
|
| Annual Production | 4,300
ton
|
| Production Hrs. Annual | 4,165
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,241 | 1,687,573 |
kWh
|
$0.064 |
| Natural Gas | $50,976 | 9,701 |
MMBtu
|
$5.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,766 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,955 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7231: Use radiant heater for spot heating | $17,352 | $11,940 | - |
$17,352
-
MMBtu
|
|
| 02 | 2.7261: Install timers and/or thermostats | $3,580 | $920 |
$1,142
17,878
kWh
|
$2,438
-
MMBtu
|
|
| 03 | 2.7226: Use computer programs to optimize hvac performance | $1,595 | $930 | - |
$1,595
-
MMBtu
|
|
| 04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,776 | $1,140 |
$2,776
43,376
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $790 | $2,025 | - |
$790
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,216 | $390 |
$1,216
19,050
kWh
|
- | |
| 07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $807 | - |
$807
12,603
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $711 | $500 |
$711
11,137
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $497 | $660 |
$497
7,913
kWh
|
- | |
| 10 | 2.4312: Improve lubrication practices | $442 | $1,500 |
$442
7,034
kWh
|
- | |
| TOTAL RECOMMENDED | $29,766 | $20,005 |
$7,591
118,991
kWh
|
$22,175
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $22,955 | $13,250 |
$3,165
49,531
kWh
|
$19,790
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs