ITAC Assessment: UF0183
ITAC logo
ITAC Assessment: UF0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel Wire Mesh
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 200,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 7,344
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,494 5,738,570
kWh
Electricity Demand $133,729 14,899
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,404 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,839 $1,956 $2,031
53,341
kWh
$808
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $1,078 $1,100 $1,078
28,429
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $1,073 $1,913 $634
16,706
kWh
$439
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,556 $1,850 $5,556
146,249
kWh
- - - -
05 2.4226: Use / purchase optimum sized compressor $1,573 - - $1,573
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $9,095 $36,500 - - - $9,095 -
07 2.8121: Apply for tax-free status for energy purchases $58,776 - - - $7,347
-
lb
- $51,429
08 3.7121: Improve handling practices $12,852 $6,000 - - - $12,852 -
09 4.321: Optimize production lot sizes and inventories $18,562 $8,530 - - - $18,562 -
TOTAL RECOMMENDED $111,404 $57,849 $9,299
244,725
kWh
$2,820
-
kW-mo/yr
$7,347
-
lb
$40,509 $51,429
TOTAL IMPLEMENTED $9,468 $5,719 $8,221
216,296
kWh
$1,247
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs