ITAC Assessment: AS0609
ITAC logo
ITAC Assessment: AS0609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cold Storage
NAICS 493190: Other Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area 35,920
ft2
Annual Production 925,000
units
Production Hrs. Annual 3,654
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,031 511,042
kWh
Electricity Demand $21,966 1,483
kW-mo/yr
Electricity Fees $6,469 -
Fuel Oil #1 $128,365 4,515
MMBtu
Fuel Oil #2 $4,842 175
MMBtu
TOTAL YEARLY COSTS $215,673
RECOMMENDED SAVINGS* $41,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Fuel Oil #2 Savings
01 2.9114: Use solar heat to make electricty $21,733 $150,416 $19,112
180,817
kWh
$2,621
-
kW-mo/yr
- -
02 2.7226: Use computer programs to optimize hvac performance $8,783 $627 $5,115
48,391
kWh
$3,668
-
kW-mo/yr
- -
03 2.8226: Increase efficiency of trucks $6,674 $4,249 - - $6,425
-
MMBtu
$249
-
MMBtu
04 2.7425: Clean or color roof to reduce solar load $3,521 $34,268 $1,509
14,273
kWh
$2,012
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,142 $4,125 $782
7,399
kWh
$360
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,853 $193,685 $26,518
250,880
kWh
$8,661
-
kW-mo/yr
$6,425
-
MMBtu
$249
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs