Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ink
NAICS 325910: Printing Ink Manufacturing
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 70,000
ft2
Annual Production 36,090,617
lb
Production Hrs. Annual 3,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,179 1,164,451
kWh
Electricity Demand $21,542 3,798
kW-mo/yr
Electricity Fees $1,500 -
Natural Gas $58,699 7,430
MMBtu
Waste Disposal Costs
Water Usage $5,350 1,110
Tgal
Water Disposal $558 160
Tgal
TOTAL YEARLY COSTS $161,828
RECOMMENDED SAVINGS* $29,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $1,680 - $1,680
26,373
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $754 - $442
6,945
kWh
$312
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,422 $13,970 $7,172
112,597
kWh
$2,312
-
kW-mo/yr
- $5,938
04 2.7442: Keep doors and windows shut when not on use $914 $4,215 - - $914
-
MMBtu
-
05 2.7291: Reschedule and rearrange multiple-source heating systems $1,632 - $2,829
44,412
kWh
- $(-1,197.0)
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,630 $32,000 $5,593
87,389
kWh
$1,525
-
kW-mo/yr
$1,512
-
MMBtu
-
TOTAL RECOMMENDED $29,032 $50,185 $17,716
277,716
kWh
$4,149
-
kW-mo/yr
$1,229
-
MMBtu
$5,938
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs