Assessment Year | 2023 |
---|---|
Principal Product | Ink |
NAICS | 325910: Printing Ink Manufacturing |
SIC | 2893: Printing Ink |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
70,000
ft2
|
Annual Production | 36,090,617
lb
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $74,179 | 1,164,451 |
kWh
|
$0.064 | |
Electricity Demand | $21,542 | 3,798 |
kW-mo/yr
|
$5.67 | |
Electricity Fees | $1,500 | - |
|
- | |
Natural Gas | $58,699 | 7,430 |
MMBtu
|
$7.90 | |
Waste Disposal Costs | |||||
Water Usage | $5,350 | 1,110 |
Tgal
|
$4.82 | |
Water Disposal | $558 | 160 |
Tgal
|
$3.49 | |
TOTAL YEARLY COSTS | $161,828 | ||||
RECOMMENDED SAVINGS* | $29,032 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $1,680 | - |
$1,680
26,373
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $754 | - |
$442
6,945
kWh
|
$312
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,422 | $13,970 |
$7,172
112,597
kWh
|
$2,312
-
kW-mo/yr
|
- | $5,938 | |
04 | 2.7442: Keep doors and windows shut when not on use | $914 | $4,215 | - | - |
$914
-
MMBtu
|
- | |
05 | 2.7291: Reschedule and rearrange multiple-source heating systems | $1,632 | - |
$2,829
44,412
kWh
|
- |
$(-1,197.0)
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,630 | $32,000 |
$5,593
87,389
kWh
|
$1,525
-
kW-mo/yr
|
$1,512
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $29,032 | $50,185 |
$17,716
277,716
kWh
|
$4,149
-
kW-mo/yr
|
$1,229
-
MMBtu
|
$5,938 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs