| Assessment Year | 2014 |
|---|---|
| Principal Product | Canned Vegetables |
| NAICS | 311421: Fruit and Vegetable Canning |
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
398,000
ft2
|
| Annual Production | 38,000
ton
|
| Production Hrs. Annual | 3,360
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $176,080 | 2,496,500 |
kWh
|
$0.071 |
| Electricity Demand | $48,581 | 6,825 |
kW-mo/yr
|
$7.12 |
| Electricity Fees | $26,157 | - |
|
- |
| Natural Gas | $432,232 | 90,942 |
MMBtu
|
$4.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2447: Heat water with exhaust heat | $14,601 | $9,600 | - | - |
$14,601
-
MMBtu
|
|
| 02 | 2.2511: Insulate bare equipment | $9,196 | $7,095 | - | - |
$9,196
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,031 | $10,568 |
$5,404
78,658
kWh
|
$1,627
-
kW-mo/yr
|
- | |
| 04 | 2.7134: Use photocell controls | $2,865 | $630 |
$2,202
32,063
kWh
|
$663
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $453 | $525 |
$453
6,602
kWh
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $1,974 | $1,053 | - | - |
$1,974
-
MMBtu
|
|
| 07 | 2.2136: Install / repair insulation on steam lines | $408 | $970 | - | - |
$408
-
MMBtu
|
|
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $288 | $70 |
$208
3,024
kWh
|
$80
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $36,816 | $30,511 |
$8,267
120,347
kWh
|
$2,370
-
kW-mo/yr
|
$26,179
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs