ITAC Assessment: IA0528
ITAC logo
ITAC Assessment: IA0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Canned Vegetables
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 398,000
ft2
Annual Production 38,000
ton
Production Hrs. Annual 3,360
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,080 2,496,500
kWh
Electricity Demand $48,581 6,825
kW-mo/yr
Electricity Fees $26,157 -
Natural Gas $432,232 90,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $14,601 $9,600 - - $14,601
-
MMBtu
02 2.2511: Insulate bare equipment $9,196 $7,095 - - $9,196
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,031 $10,568 $5,404
78,658
kWh
$1,627
-
kW-mo/yr
-
04 2.7134: Use photocell controls $2,865 $630 $2,202
32,063
kWh
$663
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $453 $525 $453
6,602
kWh
- -
06 2.2136: Install / repair insulation on steam lines $1,974 $1,053 - - $1,974
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $408 $970 - - $408
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $288 $70 $208
3,024
kWh
$80
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,816 $30,511 $8,267
120,347
kWh
$2,370
-
kW-mo/yr
$26,179
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs