| Assessment Year | 2001 |
|---|---|
| Principal Product | gears |
| NAICS |
n/a
|
| SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
| Sales Range | $1 M to 5M |
| # of Employees | 23 |
| Plant Area |
32,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,007 | 258,400 |
kWh
|
$0.074 |
| Electricity Demand | $8,998 | 1,146 |
kW-mo/yr
|
$7.85 |
| Electricity Fees | $2,918 | - |
|
- |
| Natural Gas | $9,404 | 1,720 |
MMBtu
|
$5.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,995 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,649 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8123: Pay utility bills on time | $605 | - | - | - | $605 | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $210 | - |
$210
3,000
kWh
|
- | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $345 | - |
$345
4,926
kWh
|
- | - | - | - | |
| 04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,383 | $2,500 | - | - | - |
$1,383
-
MMBtu
|
- | |
| 05 | 2.6218: Turn off equipment when not in use | $11,959 | - |
$10,912
148,264
kWh
|
$1,072
-
kW-mo/yr
|
- | - | $(-25.0) | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $358 | $60 |
$319
4,349
kWh
|
$39
-
kW-mo/yr
|
- | - | - | |
| 07 | 4.513: Re-arrange equipment layout to reduce labor costs | $3,135 | - | - | - | - | - | $3,135 | |
| TOTAL RECOMMENDED | $17,995 | $2,560 |
$11,786
160,539
kWh
|
$1,111
-
kW-mo/yr
|
$605 |
$1,383
-
MMBtu
|
$3,110 | ||
| TOTAL IMPLEMENTED | $15,649 | - |
$11,467
156,190
kWh
|
$1,072
-
kW-mo/yr
|
- | - | $3,110 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs