ITAC Assessment: SU0111
ITAC logo
ITAC Assessment: SU0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product gears
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 32,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,007 258,400
kWh
Electricity Demand $8,998 1,146
kW-mo/yr
Electricity Fees $2,918 -
Natural Gas $9,404 1,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8123: Pay utility bills on time $605 - - - $605 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $210 - $210
3,000
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $345 - $345
4,926
kWh
- - - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $1,383 $2,500 - - - $1,383
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $11,959 - $10,912
148,264
kWh
$1,072
-
kW-mo/yr
- - $(-25.0)
06 2.7111: Reduce illumination to minimum necessary levels $358 $60 $319
4,349
kWh
$39
-
kW-mo/yr
- - -
07 4.513: Re-arrange equipment layout to reduce labor costs $3,135 - - - - - $3,135
TOTAL RECOMMENDED $17,995 $2,560 $11,786
160,539
kWh
$1,111
-
kW-mo/yr
$605 $1,383
-
MMBtu
$3,110
TOTAL IMPLEMENTED $15,649 - $11,467
156,190
kWh
$1,072
-
kW-mo/yr
- - $3,110
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs