Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MILLWORK,BI-FOLD DOORS
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 1,900,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,668 5,446,366
kWh
Natural Gas $34,372 7,890
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,028 $4,050 $2,028
59,496
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,119 $1,080 $1,119
32,825
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $440 $30 $440
12,896
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,367 $5,928 $3,367
98,769
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $853 - $1,079
31,653
kWh
- $(-226.0)
06 2.7261: Install timers and/or thermostats $1,786 $2,365 $1,389
40,739
kWh
$397
-
MMBtu
-
TOTAL RECOMMENDED $9,593 $13,453 $9,422
276,378
kWh
$397
-
MMBtu
$(-226.0)
TOTAL IMPLEMENTED $5,373 $7,525 $4,976
145,956
kWh
$397
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs