ITAC Assessment: MZ0248
ITAC logo
ITAC Assessment: MZ0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product smoked meat
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 303
Plant Area 98,000
ft2
Annual Production 36,000,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,277 6,715,229
kWh
Electricity Demand $46,345 14,820
kW-mo/yr
Natural Gas $173,828 69,629
MMBtu
Waste Disposal Costs
Water Usage $55,684 17,364,231
Tgal
TOTAL YEARLY COSTS $781,134
RECOMMENDED SAVINGS* $18,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,174 $45,562 $5,967
79,560
kWh
$415
-
kW-mo/yr
$1,792
02 2.4221: Install compressor air intakes in coolest locations $2,015 $1,988 $2,015
26,874
kWh
- -
03 2.4133: Use most efficient type of electric motors $6,291 $65,400 $5,881
78,423
kWh
$410
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,536 - $1,436
19,146
kWh
$100
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,016 $112,950 $15,299
204,003
kWh
$925
-
kW-mo/yr
$1,792
TOTAL IMPLEMENTED $16,480 $112,950 $13,863
184,857
kWh
$825
-
kW-mo/yr
$1,792
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs