ITAC Assessment: AS0611
ITAC logo
ITAC Assessment: AS0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Animal Products
NAICS 112420: Goat Farming
SIC 0214: Sheep and Goats
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 39,500
ft2
Annual Production 600,000
lb
Production Hrs. Annual 3,422
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,798 462,309
kWh
Electricity Demand $13,608 1,026
kW-mo/yr
Electricity Fees $6,189 -
Fuel Oil #1 $53,700 1,906
MMBtu
Other Gas $5,877 173
MMBtu
TOTAL YEARLY COSTS $132,172
RECOMMENDED SAVINGS* $144,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Gas Savings Administrative Changes Savings Primary Product Savings
01 4.511: Expand operations into unused space $82,237 $165,793 $(-7,105.0)
(-62,212)
kWh
$(-2,458.0)
-
kW-mo/yr
- - $41,800 $50,000
02 2.9114: Use solar heat to make electricty $44,612 $333,378 $39,921
349,572
kWh
$4,691
-
kW-mo/yr
- - - -
03 2.8112: Combine utility meters $12,846 $583 - - $12,846 - - -
04 2.7226: Use computer programs to optimize hvac performance $2,710 $3,302 $1,848
16,181
kWh
$862
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,182 $4,238 $1,996
17,484
kWh
$207
-
kW-mo/yr
- - $(-21.0) -
06 2.6214: Shut off pilots in standby equipment $82 $100 - - - $82
-
MMBtu
- -
TOTAL RECOMMENDED $144,669 $507,394 $36,660
321,025
kWh
$3,302
-
kW-mo/yr
$12,846 $82
-
MMBtu
$41,779 $50,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs