ITAC Assessment: NC0367
ITAC logo
ITAC Assessment: NC0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $100
M
to 500
M
# of Employees 1,000
Plant Area 300,000
ft2
Annual Production 375,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,879 14,258,000
kWh
Electricity Demand $363,960 43,277
kW-mo/yr
Electricity Fees $22,198 -
Coal $91,490 21,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $43,971 $100,000 $29,834
989,520
kWh
$25,613
-
kW-mo/yr
$(-3,077.0)
-
MMBtu
$(-8,399.0)
-
Tgal
- -
02 2.3321: Use steam pressure reduction to generate power $9,176 $30,000 $8,206
272,160
kWh
$3,310
-
kW-mo/yr
$(-1,340.0)
-
MMBtu
- - $(-1,000.0)
03 2.4151: Develop a repair/replace policy $588 $1,297 $320
10,605
kWh
$268
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $4,742 $6,500 - - $4,742
-
MMBtu
- - -
05 2.4221: Install compressor air intakes in coolest locations $2,263 $5,800 $1,252
41,515
kWh
$1,011
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,600 $100 $3,945
130,960
kWh
$1,655
-
kW-mo/yr
- - $(-1,200.0) $(-800.0)
07 2.4239: Eliminate or reduce compressed air usage $389 $960 $172
5,720
kWh
$217
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $17,438 $76,397 $13,533
448,872
kWh
$7,551
-
kW-mo/yr
- - - $(-3,646.0)
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,310 $50 $1,030
34,160
kWh
$1,280
-
kW-mo/yr
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,690 $5,576 $671
22,269
kWh
$1,019
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $86,167 $226,680 $58,963
1,955,781
kWh
$41,924
-
kW-mo/yr
$325
-
MMBtu
$(-8,399.0)
-
Tgal
$(-1,200.0) $(-5,446.0)
TOTAL IMPLEMENTED $6,887 $2,407 $5,467
181,445
kWh
$3,420
-
kW-mo/yr
- - $(-1,200.0) $(-800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs