| Assessment Year | 1996 |
|---|---|
| Principal Product | Noodles, egg noodles, and fortune cookies |
| NAICS |
n/a
|
| SIC | 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
35,000
ft2
|
| Annual Production | 12,000,000
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,000 | 850,234 |
kWh
|
$0.054 |
| Electricity Demand | $51,891 | 2,830 |
kW-mo/yr
|
$18.34 |
| Natural Gas | $59,709 | 9,445 |
MMBtu
|
$6.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $77,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $72,605 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $7,193 | $4,900 |
$7,193
70,047
kWh
|
- | - | - | |
| 02 | 2.2311: Heat treat parts only to required specifications or standards | $655 | $900 | - |
$655
-
MMBtu
|
- | - | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $4,695 | $1,100 |
$4,695
38,980
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $262 | $153 |
$262
2,345
kWh
|
- | - | - | |
| 05 | 2.7144: Install spectral reflectors / delamp | $1,200 | $865 |
$1,200
11,430
kWh
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $494 | $287 |
$494
4,689
kWh
|
- | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $456 | - | - | - | - | $456 | |
| 08 | 3.1191: Change procedures / equipment / operating conditions | $63,000 | $1,155 | - | - |
$63,000
-
lb
|
- | |
| TOTAL RECOMMENDED | $77,955 | $9,360 |
$13,844
127,491
kWh
|
$655
-
MMBtu
|
$63,000
-
lb
|
$456 | ||
| TOTAL IMPLEMENTED | $72,605 | $7,360 |
$9,149
88,511
kWh
|
- |
$63,000
-
lb
|
$456 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs