ITAC Assessment: IA0109
ITAC logo
ITAC Assessment: IA0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product electromechanical equipment
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 140,800
ft2
Annual Production 58,500
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,025 1,426,436
kWh
Natural Gas $10,850 2,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,253 $20,116 $12,253
148,007
kWh
02 2.7135: Install occupancy sensors $1,648 $2,347 $1,648
19,930
kWh
03 2.7122: Disconnect ballasts $257 $25 $257
3,224
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $813 $2,100 $813
9,965
kWh
05 2.4239: Eliminate or reduce compressed air usage $686 $800 $686
8,206
kWh
06 2.4221: Install compressor air intakes in coolest locations $222 $200 $222
2,638
kWh
TOTAL RECOMMENDED $15,879 $25,588 $15,879
191,970
kWh
TOTAL IMPLEMENTED $13,323 $22,241 $13,323
161,196
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs