ITAC Assessment: AS0610
ITAC logo
ITAC Assessment: AS0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Assisted Living/Care
NAICS 623210: Residential Intellectual and Developmental Disability Facilities
SIC 8361: Residential Care
Sales Range less than $500
k
# of Employees 71
Plant Area 98,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,133
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,166 993,907
kWh
Electricity Demand $36,336 2,940
kW-mo/yr
Electricity Fees $13,752 -
Other Gas $26,099 869
MMBtu
TOTAL YEARLY COSTS $201,353
RECOMMENDED SAVINGS* $10,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
01 2.7292: Lower ceiling to reduce conditioned space $2,349 $16,000 $1,611
12,793
kWh
$738
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $2,279 $2,835 $1,992
15,818
kWh
$287
-
kW-mo/yr
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $1,708 $950 $(-390.0)
(-3,096)
kWh
$(-64.0)
-
kW-mo/yr
$2,162
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,539 $1,975 $835
6,626
kWh
$453
-
kW-mo/yr
- $251
05 2.7144: Install spectral reflectors / delamp $1,308 $61 $556
4,415
kWh
$299
-
kW-mo/yr
- $453
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $893 $510 $849
6,741
kWh
$44
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $176 $187 $176
1,397
kWh
- - -
TOTAL RECOMMENDED $10,252 $22,518 $5,629
44,694
kWh
$1,757
-
kW-mo/yr
$2,162
-
MMBtu
$704
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs