Assessment Year | 1989 |
---|---|
Principal Product | ALUMINUM & ZINC CASTINGS |
NAICS |
n/a
|
SIC | 3364: Nonferrous Die-Castings, Except Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 19,800
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,569 | 5,429,953 |
kWh
|
$0.044 |
Natural Gas | $188,941 | 55,978 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,964 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $84,738 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $68,209 | $80,000 |
$100,938
2,270,223
kWh
|
$(-32,729.0)
-
MMBtu
|
- | |
02 | 3.5314: Use in-process recycling whenever possible | $12,776 | $15,000 | - |
$(-14,724.0)
-
MMBtu
|
$27,500 | |
03 | 2.7494: Install storm windows and doors | $2,689 | $6,820 | - |
$2,689
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $577 | $500 | - |
$627
-
MMBtu
|
$(-50.0) | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $487 | $1,000 |
$487
-
kWh
|
- | - | |
06 | 2.4312: Improve lubrication practices | $6,226 | - |
$6,226
140,094
kWh
|
- | - | |
TOTAL RECOMMENDED | $90,964 | $103,320 |
$107,651
2,410,317
kWh
|
$(-44,137.0)
-
MMBtu
|
$27,450 | ||
TOTAL IMPLEMENTED | $84,738 | $103,320 |
$101,425
2,270,223
kWh
|
$(-44,137.0)
-
MMBtu
|
$27,450 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs