ITAC Assessment: WI0053
ITAC logo
ITAC Assessment: WI0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ALUMINUM & ZINC CASTINGS
NAICS
n/a
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 19,800
lb
Production Hrs. Annual 6,600
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,569 5,429,953
kWh
Natural Gas $188,941 55,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $68,209 $80,000 $100,938
2,270,223
kWh
$(-32,729.0)
-
MMBtu
-
02 3.5314: Use in-process recycling whenever possible $12,776 $15,000 - $(-14,724.0)
-
MMBtu
$27,500
03 2.7494: Install storm windows and doors $2,689 $6,820 - $2,689
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $577 $500 - $627
-
MMBtu
$(-50.0)
05 2.3132: Recharge batteries on during off-peak demand periods $487 $1,000 $487
-
kWh
- -
06 2.4312: Improve lubrication practices $6,226 - $6,226
140,094
kWh
- -
TOTAL RECOMMENDED $90,964 $103,320 $107,651
2,410,317
kWh
$(-44,137.0)
-
MMBtu
$27,450
TOTAL IMPLEMENTED $84,738 $103,320 $101,425
2,270,223
kWh
$(-44,137.0)
-
MMBtu
$27,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs