| Assessment Year | 2019 |
|---|---|
| Principal Product | Recyclable Materials |
| NAICS | 562920: Materials Recovery Facilities |
| SIC | 4953: Refuse Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 160 |
| Plant Area |
190,000
ft2
|
| Annual Production | 32,561
ton
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $66,653 | 1,147,400 |
kWh
|
$0.058 |
| Electricity Demand | $19,614 | 4,471 |
kW-mo/yr
|
$4.39 |
| Electricity Fees | $17,636 | - |
|
- |
| Natural Gas | $13,236 | 1,576 |
MMBtu
|
$8.40 |
| Fuel Oil #2 | $38,525 | 1,482 |
MMBtu
|
$26.00 |
| TOTAL YEARLY COSTS | $155,664 | |||
| RECOMMENDED SAVINGS* | $58,237 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $40,539 | $84,752 |
$(-1,785.0)
(-34,320)
kWh
|
$(-5,610.0)
-
kW-mo/yr
|
$30,153
-
MMBtu
|
$17,781 | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,383 | $7,807 |
$8,322
160,041
kWh
|
$1,742
-
kW-mo/yr
|
- | $778 | $(-459.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,615 | $5,884 |
$4,668
71,538
kWh
|
$602
-
kW-mo/yr
|
- | $332 | $13 | |
| 04 | 2.7423: Reduce heat gain by window tinting | $1,700 | $12,122 |
$1,700
26,048
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $58,237 | $110,565 |
$12,905
223,307
kWh
|
$(-3,266.0)
-
kW-mo/yr
|
$30,153
-
MMBtu
|
$18,891 | $(-446.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs