Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

909

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0566 #03 Y:2004 Use minimum steam operating pressure $75,183 $1,350
MA0566 #02 Y:2004 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $113,441 $191,180
MA0566 #01 Y:2004 Recover waste heat from equipment $148,951 $35,885
MA0561 #06 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,473 $2,750
MA0561 #05 Y:2004 Insulate bare equipment $3,147 $735
MA0561 #04 Y:2004 Reduce ventilation air $6,815 $4,530
MA0561 #03 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $7,624 $4,550
MA0561 #02 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $30,006 $25,500
MA0561 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $31,924 $75,720
MA0555 #09 Y:2004 Install occupancy sensors $535 $180
MA0555 #08 Y:2004 Install timers and/or thermostats $1,139 $650
MA0555 #07 Y:2004 Install occupancy sensors $1,836 $768
MA0555 #06 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $2,791 $4,850
MA0555 #05 Y:2004 Install timers and/or thermostats $2,840 $500
MA0555 #04 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,282 $5,430
MA0555 #03 Y:2004 Improve combustion control capability $1,915 $44,790
MA0555 #02 Y:2004 Replace electrically-operated equipment with fossil fuel equipment $16,690 $81,637
MA0555 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $212,625 $986,100
MA0553 #07 Y:2004 Insulate feedwater tank $910 $550
MA0553 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $3,228 $600