ITAC Assessment: MA0555
ITAC logo
ITAC Assessment: MA0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Automotive components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 267
Plant Area 360,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,144
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,016,591 19,373,978
kWh
Electricity Demand $180,052 28,507
kW-mo/yr
Natural Gas $583,933 60,486
MMBtu
LPG $94,585 11,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $243,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $243,653

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $212,625 $986,100 $192,593
2,663,800
kWh
$20,032
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,690 $81,637 $34,950
483,400
kWh
$1,933
-
kW-mo/yr
$(-20,193.0)
-
MMBtu
-
03 2.1116: Improve combustion control capability $1,915 $44,790 $795
11,000
kWh
- $1,120
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,282 $5,430 $3,282
45,400
kWh
- - -
05 2.7261: Install timers and/or thermostats $2,840 $500 - - - $2,840
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,791 $4,850 $2,791
38,600
kWh
- - -
07 2.7135: Install occupancy sensors $1,836 $768 $1,836
25,400
kWh
- - -
08 2.7261: Install timers and/or thermostats $1,139 $650 - - $1,139
-
MMBtu
-
09 2.7135: Install occupancy sensors $535 $180 $535
7,400
kWh
- - -
TOTAL RECOMMENDED $243,653 $1,124,905 $236,782
3,275,000
kWh
$21,965
-
kW-mo/yr
$(-17,934.0)
-
MMBtu
$2,840
-
MMBtu
TOTAL IMPLEMENTED $243,653 $1,124,905 $236,782
3,275,000
kWh
$21,965
-
kW-mo/yr
$(-17,934.0)
-
MMBtu
$2,840
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs