ITAC Assessment: SD0624
ITAC logo
ITAC Assessment: SD0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Steel fabricated racks, cabinets, accessories for Data Center, IT infrastructure
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,218 1,349,508
kWh
Electricity Demand $118,035 2,886
kW-mo/yr
Electricity Fees $14,838 -
Natural Gas $450,444 31,188
MMBtu
TOTAL YEARLY COSTS $770,535
RECOMMENDED SAVINGS* $21,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,107 $5,169 $1,229
8,862
kWh
$878
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,290 $1,500 $3,795
27,330
kWh
$495
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $8,718 $11,910 - - $8,718
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,715 $1,161 $1,209
8,721
kWh
$506
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $998 $4,300 $628
4,530
kWh
$370
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,070 $828 $659
4,752
kWh
$389
-
kW-mo/yr
- $22
07 2.2414: Use waste heat from hot flue gases to preheat $2,776 $7,884 - - $2,776
-
MMBtu
-
TOTAL RECOMMENDED $21,674 $32,752 $7,520
54,195
kWh
$2,638
-
kW-mo/yr
$11,494
-
MMBtu
$22
TOTAL IMPLEMENTED $7,075 $3,489 $5,663
40,803
kWh
$1,390
-
kW-mo/yr
- $22
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs