| Assessment Year | 2004 |
|---|---|
| Principal Product | Incestment castings |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
500,000
ft2
|
| Annual Production | 622,000
lb
|
| Production Hrs. Annual | 8,592
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,284,129 | 16,650,704 |
kWh
|
$0.077 |
| Electricity Demand | $273,617 | 3,290 |
kW-mo/yr
|
$83.17 |
| Electricity Fees | $10,991 | - |
|
- |
| Natural Gas | $603,135 | 92,267 |
MMBtu
|
$6.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $74,148 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,670 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $41,580 | $20,000 | - |
$41,580
-
kW-mo/yr
|
- | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,555 | $15,605 |
$16,164
187,300
kWh
|
$2,121
-
kW-mo/yr
|
$(-4,730.0)
-
MMBtu
|
|
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $5,980 | $9,830 | - | - |
$5,980
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,977 | $12,543 |
$4,263
49,400
kWh
|
$714
-
kW-mo/yr
|
- | |
| 05 | 2.1113: Reduce combustion air flow to optimum | $3,918 | $1,039 |
$3,918
45,400
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,228 | $600 |
$3,228
37,400
kWh
|
- | - | |
| 07 | 2.2123: Insulate feedwater tank | $910 | $550 | - | - |
$910
-
MMBtu
|
|
| TOTAL RECOMMENDED | $74,148 | $60,167 |
$27,573
319,500
kWh
|
$44,415
-
kW-mo/yr
|
$2,160
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $22,670 | $29,298 |
$23,655
274,100
kWh
|
$2,835
-
kW-mo/yr
|
$(-3,820.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs