ITAC Assessment: MA0566
ITAC logo
ITAC Assessment: MA0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Paper products
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 104,500
ft2
Annual Production 30,600
ton
Production Hrs. Annual 8,640
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,134,119 16,596,400
kWh
Electricity Demand $315,733 31,858
kW-mo/yr
Electricity Fees $5,376 -
Fuel Oil #6 $1,142,152 175,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $469,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $301,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $148,951 $35,885 - - $150,951
-
MMBtu
$(-2,000.0)
02 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $113,441 $191,180 $227,585
2,891,809
kWh
$8,822
-
kW-mo/yr
$(-111,399.0)
-
MMBtu
$(-11,567.0)
03 2.2163: Use minimum steam operating pressure $75,183 $1,350 - - $75,183
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $69,926 $70,000 - - $69,926
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $33,400 $20,000 - - $33,400
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $22,306 $16,750 - - $22,306
-
MMBtu
-
07 2.2511: Insulate bare equipment $5,889 $3,076 - - $5,889
-
MMBtu
-
TOTAL RECOMMENDED $469,096 $338,241 $227,585
2,891,809
kWh
$8,822
-
kW-mo/yr
$246,256
-
MMBtu
$(-13,567.0)
TOTAL IMPLEMENTED $301,681 $250,141 $227,585
2,891,809
kWh
$8,822
-
kW-mo/yr
$78,841
-
MMBtu
$(-13,567.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs