Assessment Year | 2006 |
---|---|
Principal Product | crushed stone and ashphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
8,712,000
ft2
|
Annual Production | 1,042,900
ton
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $718,648 | 5,226,000 |
kWh
|
$0.14 |
Electricity Demand | $19,370 | 22,411 |
kW-mo/yr
|
$0.86 |
Natural Gas | $979,862 | 86,275 |
MMBtu
|
$11.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $462,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $306,494 | $200,000 | - | - | - |
$306,494
-
MMBtu
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $61,625 | $80,000 |
$31,653
226,090
kWh
|
$972
-
kW-mo/yr
|
$24,000 | - | $5,000 | |
03 | 2.4322: Use or replace with energy efficient substitutes | $47,697 | $40,000 |
$7,697
54,976
kWh
|
- | - | - | $40,000 | |
04 | 4.131: Modify process to reduce material use/cost | $24,673 | $12,500 |
$23,812
170,088
kWh
|
$861
-
kW-mo/yr
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,395 | $2,500 |
$10,085
72,037
kWh
|
$310
-
kW-mo/yr
|
- | - | - | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $9,629 | $12,033 | - | - | - |
$9,629
-
MMBtu
|
- | |
07 | 2.4314: Use synthetic lubricant | $1,841 | $500 |
$1,786
12,757
kWh
|
$55
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $462,354 | $347,533 |
$75,033
535,948
kWh
|
$2,198
-
kW-mo/yr
|
$24,000 |
$316,123
-
MMBtu
|
$45,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs