| Assessment Year | 2004 |
|---|---|
| Principal Product | Fabric reinforced diaphragms |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
48,000
ft2
|
| Annual Production | 4,345,000
pieces
|
| Production Hrs. Annual | 6,952
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $476,028 | 5,991,886 |
kWh
|
$0.079 |
| Electricity Demand | $92,800 | 13,392 |
kW-mo/yr
|
$6.93 |
| Electricity Fees | $3,012 | - |
|
- |
| Natural Gas | $79,771 | 10,163 |
MMBtu
|
$7.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $82,989 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,924 | $75,720 |
$25,930
327,400
kWh
|
$5,994
-
kW-mo/yr
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,006 | $25,500 |
$25,938
327,500
kWh
|
$4,068
-
kW-mo/yr
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,624 | $4,550 |
$6,494
82,000
kWh
|
$1,130
-
kW-mo/yr
|
|
| 04 | 2.7314: Reduce ventilation air | $6,815 | $4,530 |
$6,815
86,500
kWh
|
- | |
| 05 | 2.2511: Insulate bare equipment | $3,147 | $735 |
$3,147
39,800
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,473 | $2,750 |
$2,598
32,800
kWh
|
$875
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $82,989 | $113,785 |
$70,922
896,000
kWh
|
$12,067
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $82,989 | $113,785 |
$70,922
896,000
kWh
|
$12,067
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs