Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,864

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0297 #05 Y:2026 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,190 $7,200
UU0297 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,000 $30,500
UU0297 #03 Y:2026 Minimize water usage $26,601 $91,000
UU0297 #02 Y:2026 Keep doors and windows shut when not on use $5,030 $43,200
UU0297 #01 Y:2026 Convert liquid heaters from underfiring to immersion or submersion heating $6,550 $23,886
NL0128 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,832 $3,600
NL0128 #05 Y:2026 Use optimum temperature $12,756 $40,000
NL0128 #04 Y:2026 Air condition only space necessary $13,467 $7,019
NL0128 #03 Y:2026 Meter waste water $18,726 $15,000
NL0128 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $41,428 $20,000
NL0128 #01 Y:2026 Apply a protective coating to racks and tanks $103,072 $2,040
LT8442 #04 Y:2026 Turn off equipment when not in use $3,161 $918
LT8442 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $474 $132
LT8442 #02 Y:2026 Install shelves / racks to utilize unused space $140,000 $32,760
LT8442 #01 Y:2026 Modify workload $6,666 $9,600
IC0341 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,180 $732
IC0341 #07 Y:2026 Use insulation in furnaces to facilitate heating / cooling $5,148 $20,800
IC0341 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,850 $26,620
IC0341 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $45,344 $21,031
IC0341 #04 Y:2026 Install compressor air intakes in coolest locations $445 $760