Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,201

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0394 #09 Y:2026 Reduce illumination to minimum necessary levels $759 $1,500
MZ0394 #08 Y:2026 Install occupancy sensors $1,060 $7,800
MZ0394 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $17,369 $47,422
MZ0394 #06 Y:2026 Install wind powered electric generator $1,273,555 $6,683,350
MZ0394 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $6,611 $16,100
MZ0394 #04 Y:2026 Install compressor air intakes in coolest locations $2,750 $8,700
MZ0394 #03 Y:2026 Replace existing chiller with high efficiency model $45,369 $248,235
MZ0394 #02 Y:2026 Chill water to the highest temperature possible $39,211 $44,974
MZ0394 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $41,275 $43,520
WM0258 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $2,026 $1,800
WM0258 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,238 $9,275
WM0258 #03 Y:2026 Lower temperature during the winter season and vice-versa $24,568 -
WM0258 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $31,599 $86,296
WM0258 #01 Y:2026 Repair or replace steam traps $37,862 $9,600
UW2601 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $54,790 $497,400
UW2601 #04 Y:2026 Install compressor air intakes in coolest locations $17,525 $8,362
UW2601 #03 Y:2026 Optimize plant power factor $37,270 $40,918
UW2601 #02 Y:2026 Eliminate or reduce compressed air usage $56,903 $23,111
UW2601 #01 Y:2026 Burn wood by-products for heat $45,129 $646,222
NT0060 #05 Y:2026 Use or replace with energy efficient substitutes $115,038 $54,957