Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ1022 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,819 $5,038
MZ1022 #01 Y:2026 Lower temperature during the winter season and vice-versa $3,255 $360
LS2605 #06 Y:2026 Replace fossil fuel equipment with electrical equipment $78,865 $433,647
LS2605 #05 Y:2026 Upgrade controls on compressors $2,498 $12,500
LS2605 #04 Y:2026 Install sub-metering equipment $6,258 $5,250
LS2605 #03 Y:2026 Clean and maintain refrigerant condensers and towers $1,247 $490
LS2605 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $365 $45
LS2605 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,280 $25
UD1129 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,317 $953
UD1129 #02 Y:2026 Utilize energy-efficient belts and other improved mechanisms $239 -
UD1129 #01 Y:2026 Turn off equipment during breaks, reduce operating time $16,412 -
SU0590 #12 Y:2026 Use solar heat to make electricty $194,971 $2,475,576
SU0590 #11 Y:2026 Use heat pump for space conditioning $3,862 $15,792
SU0590 #10 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $62,519 $375,000
SU0590 #09 Y:2026 Install vinyl strip / high speed / air curtain doors $225 $792
SU0590 #08 Y:2026 Conserve energy by efficient use of vending machines $171 $520
SU0590 #07 Y:2026 Install / repair insulation on steam lines $562 $1,047
SU0590 #06 Y:2026 Use or replace with energy efficient substitutes $261 $392
SU0590 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $945 $886
SU0590 #04 Y:2026 Use or replace with energy efficient substitutes $515 $38