ITAC Assessment: UD1129
ITAC logo
ITAC Assessment: UD1129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Die Making
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 42,000
ft2
Annual Production 1,001
units
Production Hrs. Annual 2,168
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,673 686,007
kWh
Electricity Demand $61,927 4,695
kW-mo/yr
Electricity Fees $441 -
Natural Gas $10,186 1,350
MMBtu
Other Gas $826 1
MMBtu
Waste Disposal Costs
Water Usage $73 48
Tgal
Other Liquid (non-haz) $75 1
gal
TOTAL YEARLY COSTS $152,201
RECOMMENDED SAVINGS* $20,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $16,412 - $16,412
143,088
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $239 - $146
1,271
kWh
$93
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,317 $953 $2,638
22,997
kWh
$1,679
-
kW-mo/yr
TOTAL RECOMMENDED $20,968 $953 $19,196
167,356
kWh
$1,772
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs