ITAC Assessment: ND0228
ITAC logo
ITAC Assessment: ND0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Trial parts and tools
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 30,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 6,800
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,520 674,678
kWh
Natural Gas $2,347 402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,184 $300 $1,184
14,654
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $402 $150 $402
4,982
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $769 $923 $769
9,379
kWh
04 2.6218: Turn off equipment when not in use $305 $720 $305
3,810
kWh
05 2.4133: Use most efficient type of electric motors $277 $950 $277
3,517
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $370 $102
1,172
kWh
TOTAL RECOMMENDED $3,039 $3,413 $3,039
37,514
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs