ITAC Assessment: LS2605
ITAC logo
ITAC Assessment: LS2605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Water Screens
NAICS 333120: Construction Machinery Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 145,643
ft2
Annual Production 40
units
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,731 1,088,314
kWh
Electricity Demand $25,120 7,028
kW-mo/yr
LPG $8,415 360
MMBtu
TOTAL YEARLY COSTS $158,266
RECOMMENDED SAVINGS* $90,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,280 $25 $1,280
11,129
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $365 $45 $365
3,176
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $1,247 $490 $1,247
10,844
kWh
- -
04 2.8117: Install sub-metering equipment $6,258 $5,250 $6,258
54,416
kWh
- -
05 2.4224: Upgrade controls on compressors $2,498 $12,500 $2,498
21,723
kWh
- -
06 2.1321: Replace fossil fuel equipment with electrical equipment $78,865 $433,647 $(-1,550.0)
(-13,478)
kWh
$8,415
-
MMBtu
$72,000
TOTAL RECOMMENDED $90,513 $451,957 $10,098
87,810
kWh
$8,415
-
MMBtu
$72,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs