Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automotive Tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,052 897,421
kWh
Natural Gas $5,424 1,170
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,441 $3,710 $1,441
20,223
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,068 $420 $1,068
15,240
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $234 $346 $234
3,224
kWh
-
04 2.7135: Install occupancy sensors $529 $150 $529
7,327
kWh
-
05 2.6214: Shut off pilots in standby equipment $87 $20 - $87
-
MMBtu
06 2.2511: Insulate bare equipment $1,936 $581 $1,936
27,257
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,529 $10,500 $34,064
431,419
kWh
$(-8,535.0)
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,569 $600 $3,569
50,117
kWh
-
TOTAL RECOMMENDED $34,393 $16,327 $42,841
554,807
kWh
$(-8,448.0)
-
MMBtu
TOTAL IMPLEMENTED $4,958 $1,386 $4,871
68,581
kWh
$87
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs