| Assessment Year | 1995 |
|---|---|
| Principal Product | Automotive Tubing |
| NAICS |
n/a
|
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
40,000
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,052 | 897,421 |
kWh
|
$0.071 |
| Natural Gas | $5,424 | 1,170 |
MMBtu
|
$4.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,393 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,958 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,441 | $3,710 |
$1,441
20,223
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,068 | $420 |
$1,068
15,240
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $234 | $346 |
$234
3,224
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $529 | $150 |
$529
7,327
kWh
|
- | |
| 05 | 2.6214: Shut off pilots in standby equipment | $87 | $20 | - |
$87
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $1,936 | $581 |
$1,936
27,257
kWh
|
- | |
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,529 | $10,500 |
$34,064
431,419
kWh
|
$(-8,535.0)
-
MMBtu
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,569 | $600 |
$3,569
50,117
kWh
|
- | |
| TOTAL RECOMMENDED | $34,393 | $16,327 |
$42,841
554,807
kWh
|
$(-8,448.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,958 | $1,386 |
$4,871
68,581
kWh
|
$87
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs