ITAC Assessment: MZ1022
ITAC logo
ITAC Assessment: MZ1022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product electric repair and distribution shop
NAICS 811219: Other Electronic and Precision Equipment Repair and Maintenance
SIC 7629: Electrical and Electronic Repair Shops, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 22
Plant Area 20,500
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,903 408,200
kWh
Waste Disposal Costs
Water Usage $2,248 305,932
Tgal
TOTAL YEARLY COSTS $25,151
RECOMMENDED SAVINGS* $8,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $3,255 $360 $3,255
58,133
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,819 $5,038 $940
16,783
kWh
$879
03 2.7135: Install occupancy sensors $1,436 $2,250 $1,436
25,642
kWh
-
04 2.7234: Use heat pump for space conditioning $1,615 $14,591 $1,615
28,800
kWh
-
TOTAL RECOMMENDED $8,125 $22,239 $7,246
129,358
kWh
$879
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs