ITAC Assessment: SU0590
ITAC logo
ITAC Assessment: SU0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Inspection Molding/ Compounding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 93
Plant Area 190,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,943 5,030,189
kWh
Electricity Demand $60,817 21,594
kW-mo/yr
Electricity Fees $32,724 -
Natural Gas $20,444 3,692
MMBtu
Other Gas $3,340 1
MMBtu
TOTAL YEARLY COSTS $431,268
RECOMMENDED SAVINGS* $267,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,330 $30 - - - - $1,330
02 2.4239: Eliminate or reduce compressed air usage $1,332 - $1,332
21,486
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $936 $40 $936
15,092
kWh
- - - -
04 2.4322: Use or replace with energy efficient substitutes $515 $38 $593
9,563
kWh
$148
-
kW-mo/yr
$(-225.8)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $945 $886 $687
11,082
kWh
$60
-
kW-mo/yr
- - $198
06 2.4322: Use or replace with energy efficient substitutes $261 $392 $130
2,103
kWh
$8
-
kW-mo/yr
- - $122
07 2.2136: Install / repair insulation on steam lines $562 $1,047 $562
9,071
kWh
- - - -
08 2.6211: Conserve energy by efficient use of vending machines $171 $520 $171
2,759
kWh
- - - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $225 $792 - - $225
-
MMBtu
- -
10 2.8227: Adjust / maintain fork lift trucks for most efficient operation $62,519 $375,000 $(-18,481.0)
(-298,080)
kWh
- - $81,000
-
MMBtu
-
11 2.7234: Use heat pump for space conditioning $3,862 $15,792 $(-236.4)
(-3,813)
kWh
- $4,099
-
MMBtu
- -
12 2.9114: Use solar heat to make electricty $194,971 $2,475,576 $194,971
3,144,696
kWh
- - - -
TOTAL RECOMMENDED $267,628 $2,870,111 $180,665
2,913,959
kWh
$216
-
kW-mo/yr
$4,098
-
MMBtu
$81,000
-
MMBtu
$1,649
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs