Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,651

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0274 #02 Y:2026 Recover waste heat from equipment $2,358 $1,000
DL0274 #01 Y:2026 Recover waste heat from equipment $803 -
WV0699 #10 Y:2026 Eliminate or reduce compressed air usage $830 $962
WV0699 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $1,006 $200
WV0699 #08 Y:2026 Install set-back timers $1,060 $1,250
WV0699 #07 Y:2026 Eliminate or reduce compressed air usage $1,117 $221
WV0699 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,298 $5,700
WV0699 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,454 $1,704
WV0699 #04 Y:2026 Insulate bare equipment $3,455 $1,276
WV0699 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,173 $756
WV0699 #02 Y:2026 Upgrade controls on compressors $5,185 $3,635
WV0699 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,816 $25,580
UW2607 #03 Y:2026 Optimize plant power factor $1,034 $3,395
UW2607 #02 Y:2026 Install occupancy sensors $6,789 $3,326
UW2607 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,097 $13,445
AS0618 #10 Y:2026 Insulate glazing, walls, ceilings, and roofs $67 $728
AS0618 #09 Y:2026 Reduce glazed areas in buildings $69 $769
AS0618 #08 Y:2026 Keep equipment clean $466 $1,354
AS0618 #07 Y:2026 Utilize controls to operate equipment only when needed $488 $586
AS0618 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $906 $178