ITAC Assessment: AS0618
ITAC logo
ITAC Assessment: AS0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal, plastic, Fiber, Foam repurposing
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 225,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,304 234,800
kWh
Electricity Demand $21,501 1,460
kW-mo/yr
Electricity Fees $4,427 -
Fuel Oil #2 $182,791 7,937
MMBtu
Other Energy $29,989 1
MMBtu
TOTAL YEARLY COSTS $248,012
RECOMMENDED SAVINGS* $51,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8226: Increase efficiency of trucks $18,148 $80,584 - - $18,148
-
MMBtu
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $12,397 $250,000 $(-8,557.0)
(-216,080)
kWh
$(-4,395.0)
-
kW-mo/yr
$23,099
-
MMBtu
$2,250 -
03 2.1331: Burn a less expensive grade of fuel $9,381 $6,914 - - - - $9,381
04 2.8223: Add air shields to trucks to increase fuel mileage $8,752 $14,707 - - $8,752
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,050 $1,691 $730
18,441
kWh
$320
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $906 $178 $600
15,142
kWh
$306
-
kW-mo/yr
- - -
07 2.6231: Utilize controls to operate equipment only when needed $488 $586 $394
9,958
kWh
$94
-
kW-mo/yr
- - -
08 2.6125: Keep equipment clean $466 $1,354 $466
11,757
kWh
- - - -
09 2.7421: Reduce glazed areas in buildings $69 $769 $47
1,177
kWh
$22
-
kW-mo/yr
- - -
10 2.7491: Insulate glazing, walls, ceilings, and roofs $67 $728 $32
808
kWh
$35
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $51,724 $357,511 $(-6,288.0)
(-158,797)
kWh
$(-3,618.0)
-
kW-mo/yr
$49,999
-
MMBtu
$2,250 $9,381
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs