ITAC Assessment: CO0721
ITAC logo
ITAC Assessment: CO0721
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fabricated structural steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 140,433
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 2,392
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,859 1,557,396
kWh
Electricity Demand $126,454 7,062
kW-mo/yr
Electricity Fees $4,659 -
Natural Gas $45,663 7,655
MMBtu
TOTAL YEARLY COSTS $235,635
RECOMMENDED SAVINGS* $22,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,340 $1,500 $1,340
39,400
kWh
$2,000
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,680 $57,330 $4,600
133,300
kWh
$10,370
-
kW-mo/yr
$150 $560
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $3,080 $13,230 $590
16,700
kWh
$2,490
-
kW-mo/yr
- -
TOTAL RECOMMENDED $22,100 $72,060 $6,530
189,400
kWh
$14,860
-
kW-mo/yr
$150 $560
TOTAL IMPLEMENTED $3,340 $1,500 $1,340
39,400
kWh
$2,000
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs