ITAC Assessment: UF0145
ITAC logo
ITAC Assessment: UF0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Packaged Fruit
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $1
M
to 5
M
# of Employees 300
Plant Area 68,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,439 516,999
kWh
Electricity Demand $581 1,937
kW-mo/yr
LPG $2,804 291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,729 $8,827 $2,688
37,808
kWh
$41
-
kW-mo/yr
- - -
02 2.7496: Install partitions to reduce size of conditioned space $1,843 $2,500 - - $1,843
-
MMBtu
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,532 $3,500 - - - - $5,532
04 3.1191: Change procedures / equipment / operating conditions $39,624 $18,550 $1,399
19,343
kWh
$25
-
kW-mo/yr
- $30,000 $8,200
05 2.7233: Use properly designed and sized hvac equipment $1,868 $3,575 $1,825
25,791
kWh
$43
-
kW-mo/yr
- - -
06 3.4113: Treat and reuse rinse waters $11,487 $40,000 - - - - $11,487
TOTAL RECOMMENDED $63,083 $76,952 $5,912
82,942
kWh
$109
-
kW-mo/yr
$1,843
-
MMBtu
$30,000 $25,219
TOTAL IMPLEMENTED $20,730 $49,575 $1,825
25,791
kWh
$43
-
kW-mo/yr
$1,843
-
MMBtu
- $17,019
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs