| Assessment Year | 1996 |
|---|---|
| Principal Product | Packaged Fruit |
| NAICS |
n/a
|
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $1 M to 5M |
| # of Employees | 300 |
| Plant Area |
68,000
ft2
|
| Annual Production | 250,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,439 | 516,999 |
kWh
|
$0.072 |
| Electricity Demand | $581 | 1,937 |
kW-mo/yr
|
$0.30 |
| LPG | $2,804 | 291 |
MMBtu
|
$9.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,083 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,730 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,729 | $8,827 |
$2,688
37,808
kWh
|
$41
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7496: Install partitions to reduce size of conditioned space | $1,843 | $2,500 | - | - |
$1,843
-
MMBtu
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,532 | $3,500 | - | - | - | - | $5,532 | |
| 04 | 3.1191: Change procedures / equipment / operating conditions | $39,624 | $18,550 |
$1,399
19,343
kWh
|
$25
-
kW-mo/yr
|
- | $30,000 | $8,200 | |
| 05 | 2.7233: Use properly designed and sized hvac equipment | $1,868 | $3,575 |
$1,825
25,791
kWh
|
$43
-
kW-mo/yr
|
- | - | - | |
| 06 | 3.4113: Treat and reuse rinse waters | $11,487 | $40,000 | - | - | - | - | $11,487 | |
| TOTAL RECOMMENDED | $63,083 | $76,952 |
$5,912
82,942
kWh
|
$109
-
kW-mo/yr
|
$1,843
-
MMBtu
|
$30,000 | $25,219 | ||
| TOTAL IMPLEMENTED | $20,730 | $49,575 |
$1,825
25,791
kWh
|
$43
-
kW-mo/yr
|
$1,843
-
MMBtu
|
- | $17,019 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs