ITAC Assessment: AM0477
ITAC logo
ITAC Assessment: AM0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum extrusions
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 70,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 6,648
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,569 3,718,067
kWh
Electricity Demand $59,824 10,281
kW-mo/yr
Natural Gas $196,013 23,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,415 $400 $20,415
220,680
kWh
- - -
02 2.2511: Insulate bare equipment $4,060 $485 - $4,060
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $6,062 - - - - $6,062
04 2.7145: Install skylights $5,600 $15,600 $5,600
90,400
kWh
- - -
05 2.2424: Use heat in flue gases to preheat products or materials $5,200 $4,300 - $5,200
-
MMBtu
- -
06 2.8112: Combine utility meters $118 - - - $118 -
TOTAL RECOMMENDED $41,455 $20,785 $26,015
311,080
kWh
$9,260
-
MMBtu
$118 $6,062
TOTAL IMPLEMENTED $26,595 $400 $20,415
220,680
kWh
- $118 $6,062
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs