Assessment Year | 2016 |
---|---|
Principal Product | Finished Metals |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 81 |
Plant Area |
35,000
ft2
|
Annual Production | 15,000,000
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,143 | 1,453,360 |
kWh
|
$0.062 |
Electricity Demand | $23,121 | 4,070 |
kW-mo/yr
|
$5.68 |
Electricity Fees | $9,804 | - |
|
- |
Natural Gas | $69,757 | 12,368 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | $192,825 | |||
RECOMMENDED SAVINGS* | $27,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,436 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $7,372 | $5,408 | - | - |
$7,372
-
MMBtu
|
- | - | |
02 | 2.2211: Use optimum temperature | $1,822 | $300 | - | - |
$5,844
-
MMBtu
|
$(-4,022.0) | - | |
03 | 2.1224: Replace boiler | $4,164 | $17,322 | - | - |
$4,164
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,583 | $22,256 |
$9,120
141,622
kWh
|
$1,531
-
kW-mo/yr
|
- | $507 | $(-575.0) | |
05 | 2.2511: Insulate bare equipment | $2,064 | $658 | - | - |
$2,064
-
MMBtu
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,207 | $944 |
$863
13,373
kWh
|
$344
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $27,212 | $46,888 |
$9,983
154,995
kWh
|
$1,875
-
kW-mo/yr
|
$19,444
-
MMBtu
|
$(-3,515.0) | $(-575.0) | ||
TOTAL IMPLEMENTED | $9,436 | $6,066 | - | - |
$9,436
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs