ITAC Assessment: OR0677
ITAC logo
ITAC Assessment: OR0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Finished Metals
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 35,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,143 1,453,360
kWh
Electricity Demand $23,121 4,070
kW-mo/yr
Electricity Fees $9,804 -
Natural Gas $69,757 12,368
MMBtu
TOTAL YEARLY COSTS $192,825
RECOMMENDED SAVINGS* $27,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $7,372 $5,408 - - $7,372
-
MMBtu
- -
02 2.2211: Use optimum temperature $1,822 $300 - - $5,844
-
MMBtu
$(-4,022.0) -
03 2.1224: Replace boiler $4,164 $17,322 - - $4,164
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,583 $22,256 $9,120
141,622
kWh
$1,531
-
kW-mo/yr
- $507 $(-575.0)
05 2.2511: Insulate bare equipment $2,064 $658 - - $2,064
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,207 $944 $863
13,373
kWh
$344
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $27,212 $46,888 $9,983
154,995
kWh
$1,875
-
kW-mo/yr
$19,444
-
MMBtu
$(-3,515.0) $(-575.0)
TOTAL IMPLEMENTED $9,436 $6,066 - - $9,436
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs