ITAC Assessment: SF0110
ITAC logo
ITAC Assessment: SF0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fiber Reinforced Composites
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 93,000
ft2
Annual Production 3,456,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,299 1,715,416
kWh
Electricity Demand $54,187 4,329
kW-mo/yr
Natural Gas $914 102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,967 $32,700 $12,164
200,176
kWh
$5,803
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $665 $576 $461
7,620
kWh
$204
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $2,278 - $2,278
37,515
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $899 - $632
10,551
kWh
$267
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $1,928 $6,792 $1,307
21,395
kWh
$621
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $1,544 $480 $1,544
25,498
kWh
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,220 $1,475 $1,542
25,498
kWh
$678
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $204 $224 $93
1,465
kWh
$111
-
kW-mo/yr
- - -
09 4.122: Develop standard procedures to improve internal yields $15,090 - - - - - $15,090
10 3.5313: Increase amount of waste recovered for resale $55,781 - - - $55,781
-
lb
- -
11 3.2172: Use automatic cleaning equipment $31,200 $76,760 - - - $31,200 -
TOTAL RECOMMENDED $129,776 $119,007 $20,021
329,718
kWh
$7,684
-
kW-mo/yr
$55,781
-
lb
$31,200 $15,090
TOTAL IMPLEMENTED $41,896 $42,247 $19,389
319,167
kWh
$7,417
-
kW-mo/yr
- - $15,090
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs