| Assessment Year | 2026 |
|---|---|
| Principal Product | Plastic caps and shoulders/closures for packaging products |
| NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $10 M to 50M |
| # of Employees | 39 |
| Plant Area |
185,000
ft2
|
| Annual Production | 600,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $117,375 | 3,096,000 |
kWh
|
$0.038 |
| Electricity Demand | $108,740 | 7,377 |
kW-mo/yr
|
$14.74 |
| Natural Gas | $40,891 | 4,201 |
MMBtu
|
$9.73 |
| TOTAL YEARLY COSTS | $267,006 | |||
| RECOMMENDED SAVINGS* | $36,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,816 | $25,580 |
$10,171
268,357
kWh
|
$5,645
-
kW-mo/yr
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $5,185 | $3,635 |
$2,702
71,303
kWh
|
$2,483
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,173 | $756 |
$2,684
70,810
kWh
|
$1,489
-
kW-mo/yr
|
- | |
| 04 | 2.2511: Insulate bare equipment | $3,455 | $1,276 |
$2,221
58,614
kWh
|
$1,234
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,454 | $1,704 |
$1,570
41,434
kWh
|
$884
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,298 | $5,700 |
$767
20,245
kWh
|
$531
-
kW-mo/yr
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $1,117 | $221 |
$572
15,097
kWh
|
$545
-
kW-mo/yr
|
- | |
| 08 | 2.6232: Install set-back timers | $1,060 | $1,250 |
$237
6,247
kWh
|
$103
-
kW-mo/yr
|
$720
-
MMBtu
|
|
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,006 | $200 |
$652
17,214
kWh
|
$354
-
kW-mo/yr
|
- | |
| 10 | 2.4239: Eliminate or reduce compressed air usage | $830 | $962 |
$535
14,123
kWh
|
$295
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $36,394 | $41,284 |
$22,111
583,444
kWh
|
$13,563
-
kW-mo/yr
|
$720
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs