ITAC Assessment: WV0699
ITAC logo
ITAC Assessment: WV0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic caps and shoulders/closures for packaging products
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 185,000
ft2
Annual Production 600,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,375 3,096,000
kWh
Electricity Demand $108,740 7,377
kW-mo/yr
Natural Gas $40,891 4,201
MMBtu
TOTAL YEARLY COSTS $267,006
RECOMMENDED SAVINGS* $36,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,816 $25,580 $10,171
268,357
kWh
$5,645
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $5,185 $3,635 $2,702
71,303
kWh
$2,483
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,173 $756 $2,684
70,810
kWh
$1,489
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $3,455 $1,276 $2,221
58,614
kWh
$1,234
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,454 $1,704 $1,570
41,434
kWh
$884
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,298 $5,700 $767
20,245
kWh
$531
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $1,117 $221 $572
15,097
kWh
$545
-
kW-mo/yr
-
08 2.6232: Install set-back timers $1,060 $1,250 $237
6,247
kWh
$103
-
kW-mo/yr
$720
-
MMBtu
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,006 $200 $652
17,214
kWh
$354
-
kW-mo/yr
-
10 2.4239: Eliminate or reduce compressed air usage $830 $962 $535
14,123
kWh
$295
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,394 $41,284 $22,111
583,444
kWh
$13,563
-
kW-mo/yr
$720
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs