Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,695

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0398 #06 Y:2026 Use solar heat to make electricty $70,342 $585,001
MZ0398 #05 Y:2026 Analyze flue gas for proper air/fuel ratio $6,340 $1,000
MZ0398 #04 Y:2026 Install occupancy sensors $1,099 $2,700
MZ0398 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,385 $2,299
MZ0398 #02 Y:2026 Maintain air filters by cleaning or replacement $722 $600
MZ0398 #01 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,578 -
LT8448 #05 Y:2026 Use solar heat to make electricty $556,491 $7,323,896
LT8448 #04 Y:2026 Install vinyl strip / high speed / air curtain doors $23,347 $12,442
LT8448 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,744 $7,251
LT8448 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,180 -
LT8448 #01 Y:2026 Modify refrigeration system to operate at a lower pressure $59,448 $219,165
LS2606 #04 Y:2026 Use or replace with energy efficient substitutes $35,573 $285,000
LS2606 #03 Y:2026 Install occupancy sensors $386 $765
LS2606 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,072 $13,213
LS2606 #01 Y:2026 Install sub-metering equipment $6,150 $2,500
MZ1023 #09 Y:2026 Use steam sparging or injections in place of indirect heating $163,794 $190,000
MZ1023 #08 Y:2026 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $81,881 $630,000
MZ1023 #07 Y:2026 Utilize controls to operate equipment only when needed $1,311 $2,140
MZ1023 #06 Y:2026 Insulate bare equipment $31,375 $16,500
MZ1023 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $13,206 $54,300