ITAC Assessment: MZ1023
ITAC logo
ITAC Assessment: MZ1023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Convention hall
NAICS 561920: Convention and Trade Show Organizers
SIC 7389: Business Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 82
Plant Area 2,200,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,502,468 29,137,122
kWh
Electricity Demand $390,837 95,195
kW-mo/yr
Natural Gas $64,234 7,383
MMBtu
Other Energy $319,031 13,937
MMBtu
TOTAL YEARLY COSTS $3,276,570
RECOMMENDED SAVINGS* $380,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,255 $49,072 $15,801
183,737
kWh
$1,217
-
kW-mo/yr
- - $8,237
02 2.7135: Install occupancy sensors $8,361 $10,000 $8,361
97,225
kWh
- - - -
03 2.3113: Make ice during off peak hours for cooling $8,543 $33,000 $8,543
99,338
kWh
- - - -
04 4.661: Level zero – install control systems for existing equipment $47,010 $41,600 $47,010
546,624
kWh
- - - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $13,206 $54,300 - - $13,206
-
MMBtu
- -
06 2.2511: Insulate bare equipment $31,375 $16,500 $23,670
275,232
kWh
$7,705
-
kW-mo/yr
- - -
07 2.6231: Utilize controls to operate equipment only when needed $1,311 $2,140 $1,311
15,248
kWh
- - - -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $81,881 $665,000 $36,949
429,642
kWh
$2,416
-
kW-mo/yr
$42,516
-
MMBtu
- -
09 2.1393: Use steam sparging or injections in place of indirect heating $163,794 $190,000 - - - $63,794
-
MMBtu
$100,000
TOTAL RECOMMENDED $380,736 $1,061,612 $141,645
1,647,046
kWh
$11,338
-
kW-mo/yr
$55,722
-
MMBtu
$63,794
-
MMBtu
$108,237
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs